PROJECTS
Wastewater Treatment Projects, Potable Water Treatment, and Water Storage ProjectsAquaWorks DBO provides water and wastewater treatment solutions for a broad range of clients in the Rocky Mountains. The following is a sample of facilities for which we provided design, engineering, optimization, permitting, construction, start-up, operations, or consulting.
-
FLORISSANT WATER & SANITATION WWTP
Project Name: Florissant Water and Sanitation District Wastewater Treatment Plant
Location: Florissant, Colorado
Summary of Work: Funding acquisition, Preliminary Engineering Report, and Site Application for a 56,975 GPD facility that has a capacity to treat wastewater for up to 800 residents. -
FLORISSANT WATER & SANITATION WTP
Project Name: Florissant Water and Sanitation District Water Treatment Plant
Location: Florissant, Colorado
Summary of Work: Funding acquisition and final engineering design for a potable water filtration system designed to meet the surface water treatment rule. Design flow rate of 50 GPM. -
ANGEL VIEW AT TWIN LAKES
Project Name: Angel View at Twin Lakes
Location: Lake County, Colorado
Summary of Work: Preliminary design for a drinking water treatment plant, wastewater treatment plant, and water storage tank for a community of 75 homes. -
ELDORADO SPRINGS WWTP
Project Name: Eldorado Springs Wastewater Treatment Facility
Location: Boulder County, Colorado
Summary of Work: Permitting and engineering consulting for a 32,000 GPD sequencing batch reactor (SBR) wastewater treatment facility for an existing residential neighborhood in Boulder County, Colorado. -
NORTH RANGE BUSINESS PARK
Project Name: North Range Business Park
Location: Cheyenne, WY
Summary of Work: Lead engineer of a design build team responsible for engineering, permitting, and constructing a water storage tank and booster pump station. -
OSHARA VILLAGE WRF
Project Name: Oshara Village Water Reclamation Facility
Location: Santa Fe, New Mexico
Summary of Work: Engineering, permitting, and construction of a new 60,000 GPD turnkey water recycling facility, used for irrigation of landscaping with reclaimed wastewater within a sustainable residential development in Santa Fe — completed in 2008. -
MOUNTAIN WATER & SANITATION WWTP
Project Name: Mountain Water and Sanitation District Wastewater Treatment Plant
Location: Conifer, Colorado
Summary of Work: Preliminary engineering, funding acquisition assistance, and final design for the upgrade of a 100,000 GPD wastewater treatment facility serving a community of 900 people. -
SHWAYDER CAMP WWTP
Project Name: Shwayder Camp Wastewater Treatment Facility Upgrades
Location: Idaho Springs, Clear Creek County, Colorado
Summary of Work: Replacement (design, permitting, construction, and start-up) of a recirculating sand-filter wastewater treatment system at a summer camp into a 9,000 GPD Sequencing Batch Reactor (SBR) system, completed in 2008. -
MINING WATER TREATMENT SYSTEM
Project Name: Mining Water Treatment System
Location: Clear Creek County, Colorado
Summary of Work: Design, permitting and construction of a 125,000 GPD water ultra-filtration system and related buildings, to treat potable water within the mining complex, completed in 2008. -
DOTSERO MHP WWTP
Project Name: Dotsero Mobile Home Park
Location: Dotsero, Colorado
Summary of Work: Design, construction, and start-up of a new 30,000 GPD Sequence Batch Reactor (SBR) wastewater treatment system for an existing mobile home park — completed in 2007. -
BIG ELK MEADOWS WATER ASSOCIATION
Project Name: Big Elk Meadows Water Treatment System
Location: Estes Park, Colorado
Summary of Work: System performance optimization, engineering consulting, funding assistance, and disaster recovery. -
MOUNTAIN WATER & SANITATION WTP
Project Name: Mountain Water and Sanitation District Water Treatment
Location: Conifer, Colorado
Summary of Work: Engineering and permitting of a 25,000 GPD potable water treatment system featuring an ion exchange unit. -
CITY OF CRIPPLE CREEK DRINKING WATER TREATMENT SYSTEM
Project Name: City of Cripple Creek Drinking Water Treatment System
Location: Cripple Creek, Colorado
Summary of Work: System upgrades, process optimization, funding management, and regulatory compliance consulting. -
VAIL PASS REST AREA WWTP
Project Name: CDOT Vail Pass Rest Area Wastewater Treatment Improvements
Location: Vail Pass, Colorado
Summary of Work: Preliminary engineering to convert a 12,000 GPD Sequencing Batch Reactor to a Membrane Bio Reactor. -
CENTRAL CLEAR CREEK SANITATION DISTRICT
Project Name: Central Clear Creek Wastewater Treatment Improvements
Location: Dumont, Colorado
Summary of Work: Owner’s Representation, Project Management, and Field Engineering for a 120,000 GPD Membrane Bio Reactor. -
ARABIAN ACRES METROPOLITAN DISTRICT
Project Name: Arabian Acres Distribution and Treatment Improvements
Location: Teller County, Colorado
Summary of Work: Capital improvement planning, funding assistance, automatic meter read system implementation, redesign 38,000’ of existing distribution system, new water storage tank and treatment improvements. -
SHAMBHALA MOUNTAIN CENTER WWTP
Project Name: Shambhala Mountain Center Wastewater Treatment Facility
Location: Red Feather Lakes, Colorado
Summary of Work: Design and construction of a 33,000 GPD sequencing batch reactor (SBR) wastewater treatment facility for a meditation and retreat center – completed in 2011. -
MORRISON CREEK WATER & SANITATION DISTRICT
Project Name: Morrison Creek W&S District WWTP Improvement Project
Location: Steamboat Springs, Colorado
Summary of Work: Wastewater treatment planning for the replacement of a fifty-year-old 350,000 gallon per day wastewater treatment plant. -
MIGHTY ARGO UPPER LANDING SITE WATER & WASTEWATER INFRASTRUCTURE
Project Name: Mighty Argo Mixed Use Project & Recreation Area
Location: Idaho Springs, Colorado
Summary of Work: Design of wastewater reclamation facility, wastewater reuse distribution system, potable and reclaimed water storage tanks, and water booster systems. -
SUMMIT METROPOLITAN DISTRICT
Project Name: Summit Metro District Water Line Extension
Location: Kiowa, Colorado
Summary of Work: Design of a 5,200’ long extension of a 10” water line serving potable and fire flow water to a commercial development. -
VAIL PASS REST AREA DRINKING WATER
Project Name: CDOT Vail Pass Rest Area Drinking Water Treatment Improvements
Location: Vail Pass, Colorado
Summary of Work: Redesign of a potable drinking water treatment system to serve a regional rest area. -
PRAIRIE CORNER DEVELOPMENT
Project Name: Prairie Corner Wastewater Lift Station
Location: Brighton, Colorado
Summary of Work: Design and permitting of a 22,000 GPD wastewater lift station for a new commercial development. -
LAST DOLLAR HOMEOWNER ASSOCIATION
Project Name: Wastewater Treatment Improvement Project
Location: Telluride, Colorado
Summary of Work: Design, permitting and construction engineering for an 10,000 GPD containerized membrane bioreactor treatment system. -
CITY OF CRIPPLE CREEK
Project Name: Collection & Distribution System Rehabilitation
Location: Cripple Creek, Colorado
Summary of Work: Design and funding assistance for the installation of 8,800’ of water and 16,100’ of sewer main. -
COLORADO DEPARTMENT OF TRANSPORTATION EISENHOWER TUNNEL
Project Name: Drinking Water System Owner’s Representation Services
Location: Summit County, Colorado
Summary of Work: Rehabilitation of the potable water system at the tunnel facilities. -
FLORISSANT WATER & SANITATION DISTRICT
Project Name: Collection System Improvement Project
Location: Florissant, Colorado
Summary of Work: Funding consulting and engineering design to upgrade the existing 18,700’ collection system and wastewater lift station. -
COLORADO DEPARTMENT OF TRANSPORTATION NO NAME REST AREA
Project Name: Wastewater Treatment Improvement Project
Location: Glenwood Springs, Colorado
Summary of Work: Design and permitting to convert and expand a septic system to a containerized membrane bioreactor. -
COLORADO DEPARTMENT OF TRANSPORTATION BAIR RANCH REST AREA
Project Name: Wastewater Treatment Improvement Project
Location: Glenwood Springs, Colorado
Summary of Work: Design and permitting to convert a recirculating sand filter to a containerized membrane bioreactor. -
COLORADO DEPARTMENT OF TRANSPORTATION GRIZZLY CREEK REST AREA
Project Name: Wastewater Treatment Improvement Project
Location: Glenwood Springs, Colorado
Summary of Work: Design and permitting to convert a recirculating sand filter to a containerized membrane bioreactor. -
COMMUNITY OF MILNER WWTP
Project Name: Wastewater Treatment Improvement Project
Location: Routt County, Colorado
Summary of Work: Design, permitting, and funding consulting to convert and existing lagoon to a membrane bioreactor. -
COMMUNITY OF PHIPPSBURGH WWTP
Project Name: Wastewater Treatment Improvement Project
Location: Routt County, Colorado
Summary of Work: Design, permitting, and funding consulting to convert and existing lagoon to a membrane bioreactor. -
TOWN OF YAMPA
Project Name: Wastewater Treatment Improvement Project
Location: Yampa, Colorado
Summary of Work: Site Application and funding consulting to replace an existing lagoon system with a membrane bioreactor rated to treat 105,000 GPD. -
TRANSPORT METROPOLITAN DISTRICT
Project Name: TransPort Water Reclamation Facility
Location: Aurora, Colorado
Summary of Work: Design and permitting of a 40,000 GPD containerized membrane bioreactor. Treated effluent will be reused as dust control and compaction water for the project. -
RIVERDANCE RV RESORT
Project Name: Water Treatment Facility
Location: Gypsum, Colorado
Summary of Work: Permitting and design of a 40,000 GPD modular wastewater treatment system. -
STEAMBOAT MOUNTAIN SCHOOL
Project Name: Water Treatment Facility
Location: Steamboat Springs, Colorado
Summary of Work: Permitting and design of a 10,000 GPD modular wastewater treatment system.